WP1 – Requirements & evaluation


Activities

The purpose of the WP1 is to insure that the outputs of the STORM project (software and hardware) will satisfy the expectations of the industrial partners. These expectations include the specific needs for various application fields (airframe/nacelle/engine manufacturer), as well as the maturity level (technical validation, justification capability, manufacturing…).  

Within WP1, the industrial partners will set-up the different requirements for:

  • The simulation tools developed (WP2, 3 and 4)
  • The innovative Ice Protection Systems developed (WP5 and 6)
  • The experimental tests that will be performed to assess the developed software and hardware (all WPs)


During the life of the project, the outputs of the different WPs will be evaluated by in order to insure that these requirements are satisfied, and that the development phase goes well. A TRL (Technology Readiness Level) methodology has been proposed, and will be used to check that the milestones of the project (or TRL gates) are respected.

Top of page